Cable testing by detecting partial discharges

Almaz I. Valeev Tatneft-Energoservis Almetevsk, Russian Federation energoservise@tatneft.ru
Roman V. Dudenkov Tatneft-Energoservis Almetevsk, Russian Federation  
Uninterrupted operation of power supply systems of industrial enterprises, transport, agriculture, utilities and other sectors of the economy is impossible without high-reliability powercable lines (CL). This article describes the test cables by detecting partial discharges.
Materials and methods
Power cable. Registration
Download article
power cable cable DC voltage TC testing breaking isolation CR partial discharges Tatneft-Energoservi