DOI: 10.24412/2076-6785-2022-2-53-56
Abstract
This article considers a variant of solving an urgent task today – reducing capital investments for the construction of a well through the use of advanced drilling technology for the casing “direction”. Namely, the analysis of the relevance of this issue was carried out, the standard cycle of well construction was considered, two alternative approaches to the stages of well construction were proposed, calculations of the economic efficiency of these proposals and a comparison of investments when using the considered techniques were made.
Materials and methods
Determination of the well fund for a calendar year for planning the work of the advanced drilling drilling team. Selection of the executive body of work on the construction of OK “direction” by a low-power machine. Assignment of a specific team to the construction of the well fund and the beginning of work at the field. Practical implementation – after completing the construction work under the OK “direction”, the team moves to a new point, and already from under the cased OK “direction” interval, further deepening under the OK “conductor”.
Keywords
oil fields, well construction, well drilling, advanced drilling